Dannebrog Remodel


 

2026 Web Banners.png
 

2026 Web Banners (1201 x 250 px).png


32.png

Construction prep has commenced! The back storage room addition was also removed.

12_24_2025.png
 

Copy of 2025 Web Banners (1201 x 112 px) (2).png
Interior prep continues! Walls were built and windows covered to separate the south side from the north side of the building.

12_29_2025.png
 

33.png
The first phase of construction includes removing all of the interior walls and ceiling on the south side of the building.

12_30_2025.png
 

34.png
We wrapped up the year by uncovering a few beautiful design features from the past -- check out that original brick interior wall and tile ceiling!!

12_31_2025.png
 

1_9.2026.png

The drop ceiling is officially down. Now we can see more of the beautiful original tile ceiling!

1_9_2026.png
 

1_12.2026.png

All of the interior walls of the south side have been removed. One of the biggest updates of the building will include raising the south side of the building to be level with the north side!

1_12_2026.png

 

1_15.2026.png

The crew is working on clean up of the south side along with removing the night drop and ATM to make room for raising the floor on the south side. When all is said and done, the south side and north side will be all the same level!

1_15_2026.png

 

1_22.2026.png

Whew! That ole night drop was difficult to yank out! The crew is still working on the south side, clearing everything out in preparation for raising the floor.

1_21_2026.png

 

1_28.2026.png

Subfloor = INSTALLED! Interior walls = GOING UP!

We are making FAST progress on the south side of the building where the future offices, breakroom, and lobby will be.

1_28_2026.png
 

2_2.2026.png

Oh my! How beautiful is this arched doorway between the south and north sides of the building?!?! This is where our members and visitors will move from the front door, lobby sitting area, and offices to the teller line.  One of our highest priorities with this building remodel is to harken back to the way the original bank building looked. This arched doorway is key to that design vision. In addition, the crew is making quick progress on the rest of the office walls on the south side.

222026b.png
 

222026.png