Dannebrog Remodel



Construction prep has commensed! The back storage room addition was also removed.


Interior prep continues! Walls were built and windows covered to separate the south side from the north side of the building.


The first phase of construction includes removing all of the interior walls and ceiling on the south side of the building.


We wrapped up the year by uncovering a few beautiful design features from the past -- check out that original brick interior wall and tile ceiling!!


The drop ceiling is officially down. Now we can see more of the beautiful original tile ceiling!


All of the interior walls of the south side have been removed. One of the biggest updates of the building will include raising the south side of the building to be level with the north side!