Dannebrog Remodel


 

2026 Web Banners (3).png
 

 

2026 Web Banners (1201 x 250 px).png


32.png

Construction prep has commensed! The back storage room addition was also removed.

12_24_2025.png
 

Copy of 2025 Web Banners (1201 x 112 px) (2).png
Interior prep continues! Walls were built and windows covered to separate the south side from the north side of the building.

12_29_2025.png
 

33.png
The first phase of construction includes removing all of the interior walls and ceiling on the south side of the building.

12_30_2025.png
 

34.png
We wrapped up the year by uncovering a few beautiful design features from the past -- check out that original brick interior wall and tile ceiling!!

12_31_2025.png
 

35.png
The drop ceiling is officially down. Now we can see more of the beautiful original tile ceiling!

1_9_2026.png
 

36.png
All of the interior walls of the south side have been removed. One of the biggest updates of the building will include raising the south side of the building to be level with the north side!

1_12_2026.png